Jump to content

Line 1 (Changchun Rail Transit)

From Wikipedia, the free encyclopedia
Line 1
Line 1 train leaving Hongzuizi station
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
Stations15
Service
TypeRapid transit
SystemChangchun Rail Transit
Services1
Operator(s)Changchun Rail Transit Corporation
History
Opened30 June 2017; 7 years ago (2017-06-30)
Technical
Line length18.14 km (11.27 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 1 of the Changchun Rail Transit (Chinese: 长春轨道交通1号线; pinyin: Chángchūn Guǐdào Jiāotōng Yī Hào Xiàn) is a rapid transit line running from north to south Changchun. It opened on 30 June 2017. This line is 18.14 km long with 15 stations.[1][2]

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
North Ring Road — Hongzuizi 30 June 2017 18.14 km (11.27 mi)[1] 14 Phase 1
Changchun Railway Station 26 January 2019 infill station 1

Service routes

[edit]

Stations

[edit]
Station name Connections Distance
km
Location
English Chinese
North Ring Road 北环城路  8  0.00 0.00 Kuancheng
Qingfeng Road 庆丰路 1.19 1.19
Yikuang Street 一匡街 1.31 2.50
Changchun Railway Station (North) 长春站北  CJ ~ JH   CB ~ BA  Changchun railway station CCT
 4 
1.12 3.62
Changchun Railway Station 长春站  CJ ~ JH   CB ~ BA  Changchun railway station CCT
 3 
0.75 4.37
Shengli Park 胜利公园 0.93 5.30
Renmin Square 人民广场 1.42 6.72 Chaoyang / Nanguan
Jiefang Avenue 解放大路  2  1.00 7.72
Northeast Normal University 东北师大 1.57 9.29
Gongnong Square 工农广场 1.44 10.73
Fanrong Road 繁荣路 1.23 11.96
Weixing Square 卫星广场  3  0.80 12.76
Municipal Government 市政府 1.48 14.24 Nanguan
Huaqing Road 华庆路  6  1.09 15.33
Hongzuizi 红嘴子 1.08 16.41

References

[edit]
  1. ^ a b c 长春地铁1号线通车试运营. 中国新闻网 (in Chinese). 2017-06-30. Archived from the original on 2019-10-07. Retrieved 2021-11-27.
  2. ^ 长春地铁1号线达到试运营评估8个标准要求. 新华网 (in Chinese). 23 May 2017. Retrieved 7 June 2017.[dead link]